Leader Gate Valve Class 125, CL-004
Gate Valve · 2 sizes
| Size (mm / Inch) | Rate (₹) | Qty | Select |
|---|---|---|---|
| 40mm (1 1/2") | Request Quote | ||
| 300mm (12") | Request Quote |
Select a size to enquire. Original SKU references remain available for exact identification.
“Our maintenance team fitted 300mm Industrial Pipeline Component on a cooling tower circuit; well-packed transit delivery and exact size availability across the order.”
Read all 8 approved reviews for this size range
Our maintenance team fitted 300mm Industrial Pipeline Component on a cooling tower circuit; well-packed transit delivery and exact size availability across the order.
Narayan Mudaliar · 2023-10-30 · 300mm (12")Installed 300mm Industrial Pipeline Component (TV-13446) on our factory shutdown maintenance and solid casting/machining and clean ends; works well on our line.
Gopal Marathe · 2020-05-17 · 300mm (12")Supplied on schedule by Tubes & Valves MFG Co for our compressed air distribution line — fair dealer pricing and timely dispatch from Chennai without follow-up hassles (Order #15561).
Shubham Sundaram · 2021-04-22 · 300mm (12")Our maintenance team fitted 40mm Industrial Pipeline Component on a water supply header; packaged securely and arrived on schedule; performing well since commissioning.
Kartikeya Guha · 2023-03-22 · 40mm (1 1/2")Tested 40mm Industrial Pipeline Component after installation in our condensate return line; held steady under rated working pressure without any seepage.
Prashant Kothari · 2021-09-02 · 40mm (1 1/2")Commissioned 40mm Industrial Pipeline Component on our industrial utility line during recent plant work; operates smoothly with positive shut-off and matches catalogue dimensions.
Vivek Lal · 2021-02-22 · 40mm (1 1/2")Used Industrial Pipeline Component in our process pipeline — good build quality and reliable performance in daily plant operation.
Tapan Mehta · 2021-07-19 · Parent productOur maintenance team fitted Industrial Pipeline Component on a overhead tank manifold; packaged securely and arrived on schedule; performing well since commissioning.
Shirish Dikshit · 2024-05-01 · Parent product
